Start with the smallest possible upgrade. For many Amber 1.x applications that
already use ECR and do not depend on Amber's old bundled integrations, the
first—and sometimes only—application change is the Amber version in
shard.yml. V2 is mostly additive framework work, not an invitation to rewrite
your product.
The standalone Amber CLI is independent from this runtime upgrade. Install or update it when you want V2 generators; an existing application can change its framework shard without being regenerated.
Amber
2.0.0-beta.5release-gates the framework core and the new ECR web template with Grant, Micrate, and SQLite. Existing applications do not have to replace a working ORM to adopt the framework beta. Gemma, Asset Pipeline, generated auth/API resources, and native output remain separate previews.
Try the direct upgrade first
File: shard.yml — change the existing amber dependency version.
dependencies:
amber:
github: amberframework/amber
version: 2.0.0-beta.5
Keep the rest of the application's dependencies unchanged for this first pass.
Run from: the application root, beside shard.yml.
shards update amber
crystal spec
shards build
If those commands pass, launch the application through its normal development command and smoke-test the routes it actually serves. You do not need to adopt the Schema API, replace an ORM, remove working front-end tooling, or regenerate the project merely because V2 offers newer options.
When the direct upgrade needs a follow-up
The migration remains bounded, but it is not literally one line for every application. Check the matching row only when the application uses that feature:
| Existing application uses | Follow-up |
|---|---|
| ECR views and public static files | Usually no view-system migration |
| Slang or another Kilt renderer | Convert those templates to ECR |
| Amber's bundled Redis assumptions | Select and verify explicit session and pub/sub adapters |
| Database drivers that arrived through Amber | Declare the application's driver directly |
Old YAML.mapping configuration types |
Move those types to YAML::Serializable |
| Framework-internal require paths | Replace them with the public Amber entry point or current API |
| A working Webpack or other asset build | Keep it during the framework upgrade; migrate it separately if useful |
This inventory is why the guide contains more than a version edit. It is a map for the exceptions, not evidence that an ordinary Amber application must be rebuilt.
What changes in V2
| Application boundary | Amber 1.x starting point | Amber 2.0 path |
|---|---|---|
| Views | ECR, Slang, or Kilt | ECR for new and generated V2 views |
| JavaScript and CSS | Commonly Webpack-managed | The released manifest fingerprints browser-ready CSS, JS, images, and fonts without a bundler |
| Persistence | Commonly Granite or Jennifer | Existing apps may keep their working ORM; new CLI apps use Grant and a selected driver |
| Sessions | Redis-oriented configuration | Built-in memory adapter or an explicitly registered external adapter |
| WebSocket pub/sub | Redis-oriented configuration | Built-in in-process adapter or an explicitly registered external adapter |
| Request validation | Controller-specific parsing | Optional typed Schema API |
| File attachments | Application-specific integration | No bundled attachment library; Gemma is an ecosystem preview |
Before changing dependencies in a production application
Create a migration branch and capture a working baseline:
- Record the Crystal, Amber, ORM, database-driver, Redis, and asset-tool versions.
- Run the existing specs and build the application binary.
- Smoke-test the routes, session behavior, background work, WebSockets, and static assets the application actually uses.
- Back up the database and prove the restore procedure before changing an ORM or running a schema migration.
- List every Slang/Kilt template, Webpack entry point, Redis integration, and framework-generated file that will need an explicit decision.
Do not begin by deleting the old asset, persistence, or session configuration. Keep the last working path available until its replacement has passed the same checks.
1. Restore the framework baseline
After the direct upgrade commands above, resolve any compile errors against the V2 routing, controllers, views, and configuration guides. Keep persistence and asset-tool changes out of this step whenever possible.
2. Move generated and legacy views to ECR
Amber V2 removes Kilt and Slang from the supported framework path. Convert one view boundary at a time, preserve its rendered HTML contract, and run the request or feature specs that exercise it. New V2 generators emit ECR.
The Views guide documents layouts, partials, helpers, and escaping behavior for the V2 path.
3. Make sessions and pub/sub explicit
Amber V2 includes in-memory session and pub/sub adapters. They keep a clean application independent of Redis, but their state is local to one process.
Applications that require shared state across processes or hosts must register and test an external implementation. Redis is not a built-in adapter guarantee; it is one backend an application can integrate through the adapter interfaces.
Use the Redis-to-adapters guide to inventory the existing behavior, then verify expiration, logout, session rotation, broadcasts, and multi-process delivery before switching production traffic.
4. Keep an existing persistence migration separate
Amber CLI 2.0.6 installs Grant and SQLite in a newly generated web
application. That default does not require an existing Granite or Jennifer
application to change ORM during the framework upgrade. Keep its current
persistence layer for the first pass, then verify compatibility against the
application's Crystal version, shard versions, and real queries.
If you choose to move to Grant, treat that as a second migration with its own branch, database backup, restore proof, schema diff, representative reads and writes, and rollback plan. Do not mix two ORMs unless ownership of connections, transactions, migrations, and models is explicit. Review the model-layer boundary and Granite-to-Grant guide first.
5. Preserve working assets before replacing tooling
Released CLI 2.0.6 compiles browser-ready files from app/assets/ into a
fingerprinted public/assets/ manifest without requiring Node.js or a bundler.
That does not require an existing application to remove a working Webpack
pipeline during the framework upgrade.
If you adopt native ESM and the build-time Asset Pipeline contract, treat it as its own migration. Compare the complete manifest; rewritten local CSS and JavaScript dependencies; image, font, and binary bytes and MIME types; import behavior; cache headers; read-only runtime; and atomic production deployment before retiring the previous build. The Webpack-to-ESM guide and Asset Pipeline guides describe that independently reviewable migration; existing asset tooling may remain in place while the framework dependency changes.
6. Adopt optional V2 features after the baseline passes
Schema API, jobs, mailers, adapters, and expanded testing helpers can be adopted independently. Add one application boundary, write or update its specs, and restore the complete build before moving to the next.
7. Migrate request validation action by action
The old params.validation API is deprecated, not removed. Existing blocks
continue to compile and run after the V2 framework upgrade:
File: an existing action under src/controllers/ — this code may remain
unchanged during the first upgrade pass.
validation = params.validation do
required(:email) { |value| value.email? }
end
Amber plans to retain that API throughout the initial V2 compatibility window and remove it no earlier than a later minor release such as 2.5. The exact removal release will be announced separately. A deprecation warning is a prompt for a gradual migration, not evidence that a V1 application must rewrite all controllers before adopting V2.
For one action at a time:
- create its request contract under
src/schemas/; - bind it above the action with
schema :action, SchemaClass; - read typed values with
validated_as(SchemaClass)or the normalized hash withvalidated_params; - add
response_schemawhen the action returns a machine-readable API contract; and - prove valid, malformed, unsupported-media, invalid-value, and invalid-response behavior before converting the next action.
The declared schema runs automatically before the action. Do not replace the
old validator with a manual SchemaClass.validate(request) call; that is not
the V2 controller API. The complete Schema guide
shows the executable request and response path with exact file locations.
Verification gates
Use observed behavior instead of an estimated migration timeline:
| Gate | Evidence to keep |
|---|---|
| Framework | Dependency resolution, complete specs, and a compiled application binary |
| HTTP | Representative request specs for routes, pipelines, parameters, redirects, and errors |
| Sessions | Login/logout, expiration, rotation, cookie settings, and multi-process behavior where required |
| WebSockets | Subscription, broadcast, reconnect, and cross-process delivery where required |
| Assets | One build manifest; strict CSS, JavaScript, image, font, and binary lookups; rewritten dependency URLs; MIME/cache/compression responses; read-only runtime; and browser smoke tests |
| Persistence | Database backup/restore proof, migrations, transactions, and representative reads and writes |
| Deployment | A staging build produced through the same commands and configuration used in production |
A migration boundary is complete when its previous behavior is reproduced or an intentional change is documented and tested—not when a predetermined number of days has elapsed.
Getting help
When reporting a migration problem, include the smallest failing example plus the Crystal version, Amber version, previous Amber version, relevant shard versions, exact command, and complete output.
- Review the Amber V2 release notes.
- Ask in the Amber Discord.
- Report framework behavior in the Amber issue tracker.
- Report CLI and generator behavior in the Amber CLI issue tracker.